{"id":1160,"date":"2016-04-06T15:42:38","date_gmt":"2016-04-06T15:42:38","guid":{"rendered":"https:\/\/www.education.uw.edu\/t2\/?p=1160"},"modified":"2020-11-20T22:13:43","modified_gmt":"2020-11-20T22:13:43","slug":"miller-hall-phone-system-upgrade-planned-for-early-may","status":"publish","type":"post","link":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/","title":{"rendered":"Miller Hall Phone System Upgrade Planned for Early May"},"content":{"rendered":"<p>In early May all phones in Miller Hall will be upgraded.\u00a0 Beginning in 2011, UW-IT embarked on a major transformation of the legacy UW telephone service, which was no longer supportable by the vendor.\u00a0 They have planned our upgrade for the first week in May.<\/p>\n<p>As part of this upgrade, UW-IT will offer Post Day onsite support and can assist in answering questions or demonstrating the new phone sets. In addition, we will host an orientation the week of the upgrade to demo the new phones and answer questions. We will announce the location and time of the onsite training as we get closer to the upgrade date.<br \/>\nTelecom Upgrade FAQs:<\/p>\n<ul>\n<li>Will my number change? No.<\/li>\n<li>Will my saved greeting or saved voicemail be erased?\u00a0 No.<\/li>\n<li>Where can I learn more about the project? Here<\/li>\n<li>Where can I learn more about the new phones? Here<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>In early May all phones in Miller Hall will be upgraded.\u00a0 Beginning in 2011, UW-IT embarked on a major transformation of the legacy UW telephone service, which was no longer supportable by the vendor.\u00a0 They have planned our upgrade for the first week in May. As part of this upgrade, UW-IT will offer Post Day onsite support and can assist in answering questions or demonstrating the new phone sets. In addition, we will host an orientation the week of the&#8230;<\/p>\n<div><a class=\"more-link\" href=\"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/\">Continue reading <span class=\"screen-reader-text\">Miller Hall Phone System Upgrade Planned for Early May<\/span><\/a><\/div>\n","protected":false},"author":11,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1160","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"In early May all phones in Miller Hall will be upgraded. Beginning in 2011, UW-IT embarked on a major transformation of the legacy UW telephone service, which was no longer supportable by the vendor. They have planned our upgrade for the first week in May. As part of this upgrade, UW-IT will offer Post Day\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"coe\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Technology Center - WP Tech Site\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Miller Hall Phone System Upgrade Planned for Early May - Technology Center\" \/>\n\t\t<meta property=\"og:description\" content=\"In early May all phones in Miller Hall will be upgraded. Beginning in 2011, UW-IT embarked on a major transformation of the legacy UW telephone service, which was no longer supportable by the vendor. They have planned our upgrade for the first week in May. As part of this upgrade, UW-IT will offer Post Day\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2016-04-06T15:42:38+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2020-11-20T22:13:43+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Miller Hall Phone System Upgrade Planned for Early May - Technology Center\" \/>\n\t\t<meta name=\"twitter:description\" content=\"In early May all phones in Miller Hall will be upgraded. Beginning in 2011, UW-IT embarked on a major transformation of the legacy UW telephone service, which was no longer supportable by the vendor. They have planned our upgrade for the first week in May. As part of this upgrade, UW-IT will offer Post Day\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/uncategorized\\\/miller-hall-phone-system-upgrade-planned-for-early-may\\\/#blogposting\",\"name\":\"Miller Hall Phone System Upgrade Planned for Early May - Technology Center\",\"headline\":\"Miller Hall Phone System Upgrade Planned for Early May\",\"author\":{\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/author\\\/coe\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/#organization\"},\"datePublished\":\"2016-04-06T15:42:38+00:00\",\"dateModified\":\"2020-11-20T22:13:43+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/uncategorized\\\/miller-hall-phone-system-upgrade-planned-for-early-may\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/uncategorized\\\/miller-hall-phone-system-upgrade-planned-for-early-may\\\/#webpage\"},\"articleSection\":\"Uncategorized\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/uncategorized\\\/miller-hall-phone-system-upgrade-planned-for-early-may\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/category\\\/uncategorized\\\/#listItem\",\"name\":\"Uncategorized\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/category\\\/uncategorized\\\/#listItem\",\"position\":2,\"name\":\"Uncategorized\",\"item\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/category\\\/uncategorized\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/uncategorized\\\/miller-hall-phone-system-upgrade-planned-for-early-may\\\/#listItem\",\"name\":\"Miller Hall Phone System Upgrade Planned for Early May\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/uncategorized\\\/miller-hall-phone-system-upgrade-planned-for-early-may\\\/#listItem\",\"position\":3,\"name\":\"Miller Hall Phone System Upgrade Planned for Early May\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/category\\\/uncategorized\\\/#listItem\",\"name\":\"Uncategorized\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/#organization\",\"name\":\"College of Education Technology Center\",\"description\":\"WP Tech Site\",\"url\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/author\\\/coe\\\/#author\",\"url\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/author\\\/coe\\\/\",\"name\":\"coe\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/uncategorized\\\/miller-hall-phone-system-upgrade-planned-for-early-may\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a69a32dada9feba0c40ec36febe16575a2dd3eff0141a8f4b743c5bb36b933dd?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"coe\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/uncategorized\\\/miller-hall-phone-system-upgrade-planned-for-early-may\\\/#webpage\",\"url\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/uncategorized\\\/miller-hall-phone-system-upgrade-planned-for-early-may\\\/\",\"name\":\"Miller Hall Phone System Upgrade Planned for Early May - Technology Center\",\"description\":\"In early May all phones in Miller Hall will be upgraded. Beginning in 2011, UW-IT embarked on a major transformation of the legacy UW telephone service, which was no longer supportable by the vendor. They have planned our upgrade for the first week in May. As part of this upgrade, UW-IT will offer Post Day\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/uncategorized\\\/miller-hall-phone-system-upgrade-planned-for-early-may\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/author\\\/coe\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/author\\\/coe\\\/#author\"},\"datePublished\":\"2016-04-06T15:42:38+00:00\",\"dateModified\":\"2020-11-20T22:13:43+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/#website\",\"url\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/\",\"name\":\"College of Education Technology Center\",\"description\":\"WP Tech Site\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.education.uw.edu\\\/technologycenter\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Miller Hall Phone System Upgrade Planned for Early May - Technology Center","description":"In early May all phones in Miller Hall will be upgraded. Beginning in 2011, UW-IT embarked on a major transformation of the legacy UW telephone service, which was no longer supportable by the vendor. They have planned our upgrade for the first week in May. As part of this upgrade, UW-IT will offer Post Day","canonical_url":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/#blogposting","name":"Miller Hall Phone System Upgrade Planned for Early May - Technology Center","headline":"Miller Hall Phone System Upgrade Planned for Early May","author":{"@id":"https:\/\/www.education.uw.edu\/technologycenter\/author\/coe\/#author"},"publisher":{"@id":"https:\/\/www.education.uw.edu\/technologycenter\/#organization"},"datePublished":"2016-04-06T15:42:38+00:00","dateModified":"2020-11-20T22:13:43+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/#webpage"},"isPartOf":{"@id":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/#webpage"},"articleSection":"Uncategorized"},{"@type":"BreadcrumbList","@id":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.education.uw.edu\/technologycenter#listItem","position":1,"name":"Home","item":"https:\/\/www.education.uw.edu\/technologycenter","nextItem":{"@type":"ListItem","@id":"https:\/\/www.education.uw.edu\/technologycenter\/category\/uncategorized\/#listItem","name":"Uncategorized"}},{"@type":"ListItem","@id":"https:\/\/www.education.uw.edu\/technologycenter\/category\/uncategorized\/#listItem","position":2,"name":"Uncategorized","item":"https:\/\/www.education.uw.edu\/technologycenter\/category\/uncategorized\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/#listItem","name":"Miller Hall Phone System Upgrade Planned for Early May"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.education.uw.edu\/technologycenter#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/#listItem","position":3,"name":"Miller Hall Phone System Upgrade Planned for Early May","previousItem":{"@type":"ListItem","@id":"https:\/\/www.education.uw.edu\/technologycenter\/category\/uncategorized\/#listItem","name":"Uncategorized"}}]},{"@type":"Organization","@id":"https:\/\/www.education.uw.edu\/technologycenter\/#organization","name":"College of Education Technology Center","description":"WP Tech Site","url":"https:\/\/www.education.uw.edu\/technologycenter\/"},{"@type":"Person","@id":"https:\/\/www.education.uw.edu\/technologycenter\/author\/coe\/#author","url":"https:\/\/www.education.uw.edu\/technologycenter\/author\/coe\/","name":"coe","image":{"@type":"ImageObject","@id":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/a69a32dada9feba0c40ec36febe16575a2dd3eff0141a8f4b743c5bb36b933dd?s=96&d=mm&r=g","width":96,"height":96,"caption":"coe"}},{"@type":"WebPage","@id":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/#webpage","url":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/","name":"Miller Hall Phone System Upgrade Planned for Early May - Technology Center","description":"In early May all phones in Miller Hall will be upgraded. Beginning in 2011, UW-IT embarked on a major transformation of the legacy UW telephone service, which was no longer supportable by the vendor. They have planned our upgrade for the first week in May. As part of this upgrade, UW-IT will offer Post Day","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.education.uw.edu\/technologycenter\/#website"},"breadcrumb":{"@id":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/#breadcrumblist"},"author":{"@id":"https:\/\/www.education.uw.edu\/technologycenter\/author\/coe\/#author"},"creator":{"@id":"https:\/\/www.education.uw.edu\/technologycenter\/author\/coe\/#author"},"datePublished":"2016-04-06T15:42:38+00:00","dateModified":"2020-11-20T22:13:43+00:00"},{"@type":"WebSite","@id":"https:\/\/www.education.uw.edu\/technologycenter\/#website","url":"https:\/\/www.education.uw.edu\/technologycenter\/","name":"College of Education Technology Center","description":"WP Tech Site","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.education.uw.edu\/technologycenter\/#organization"}}]},"og:locale":"en_US","og:site_name":"Technology Center - WP Tech Site","og:type":"article","og:title":"Miller Hall Phone System Upgrade Planned for Early May - Technology Center","og:description":"In early May all phones in Miller Hall will be upgraded. Beginning in 2011, UW-IT embarked on a major transformation of the legacy UW telephone service, which was no longer supportable by the vendor. They have planned our upgrade for the first week in May. As part of this upgrade, UW-IT will offer Post Day","og:url":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/","article:published_time":"2016-04-06T15:42:38+00:00","article:modified_time":"2020-11-20T22:13:43+00:00","twitter:card":"summary_large_image","twitter:title":"Miller Hall Phone System Upgrade Planned for Early May - Technology Center","twitter:description":"In early May all phones in Miller Hall will be upgraded. Beginning in 2011, UW-IT embarked on a major transformation of the legacy UW telephone service, which was no longer supportable by the vendor. They have planned our upgrade for the first week in May. As part of this upgrade, UW-IT will offer Post Day"},"aioseo_meta_data":{"post_id":"1160","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2023-08-18 02:58:53","updated":"2025-06-04 06:47:32","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.education.uw.edu\/technologycenter\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.education.uw.edu\/technologycenter\/category\/uncategorized\/\" title=\"Uncategorized\">Uncategorized<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tMiller Hall Phone System Upgrade Planned for Early May\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.education.uw.edu\/technologycenter"},{"label":"Uncategorized","link":"https:\/\/www.education.uw.edu\/technologycenter\/category\/uncategorized\/"},{"label":"Miller Hall Phone System Upgrade Planned for Early May","link":"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/"}],"featured_image_urls_v2":{"full":"","thumbnail":"","medium":"","medium_large":"","large":"","1536x1536":"","2048x2048":"","320w":"","480w":"","800w":"","mug-shot":"","sidebar-width":"","full-content":""},"post_excerpt_stackable_v2":"<p>In early May all phones in Miller Hall will be upgraded.\u00a0 Beginning in 2011, UW-IT embarked on a major transformation of the legacy UW telephone service, which was no longer supportable by the vendor.\u00a0 They have planned our upgrade for the first week in May. As part of this upgrade, UW-IT will offer Post Day onsite support and can assist in answering questions or demonstrating the new phone sets. In addition, we will host an orientation the week of the upgrade to demo the new phones and answer questions. We will announce the location and time of the onsite training&hellip;<\/p>\n<div><a class=\"more-link\" href=\"https:\/\/www.education.uw.edu\/technologycenter\/uncategorized\/miller-hall-phone-system-upgrade-planned-for-early-may\/\">Continue reading <span class=\"screen-reader-text\">Miller Hall Phone System Upgrade Planned for Early May<\/span><\/a><\/div>\n","category_list_v2":"<a href=\"https:\/\/www.education.uw.edu\/technologycenter\/category\/uncategorized\/\" rel=\"category tag\">Uncategorized<\/a>","author_info_v2":{"name":"coe","url":"https:\/\/www.education.uw.edu\/technologycenter\/author\/coe\/"},"comments_num_v2":"0 comments","_links":{"self":[{"href":"https:\/\/www.education.uw.edu\/technologycenter\/wp-json\/wp\/v2\/posts\/1160","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.education.uw.edu\/technologycenter\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.education.uw.edu\/technologycenter\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.education.uw.edu\/technologycenter\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.education.uw.edu\/technologycenter\/wp-json\/wp\/v2\/comments?post=1160"}],"version-history":[{"count":4,"href":"https:\/\/www.education.uw.edu\/technologycenter\/wp-json\/wp\/v2\/posts\/1160\/revisions"}],"predecessor-version":[{"id":4028,"href":"https:\/\/www.education.uw.edu\/technologycenter\/wp-json\/wp\/v2\/posts\/1160\/revisions\/4028"}],"wp:attachment":[{"href":"https:\/\/www.education.uw.edu\/technologycenter\/wp-json\/wp\/v2\/media?parent=1160"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.education.uw.edu\/technologycenter\/wp-json\/wp\/v2\/categories?post=1160"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.education.uw.edu\/technologycenter\/wp-json\/wp\/v2\/tags?post=1160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}