Technology Center

February 13, 2015

Winter 2015 – Cycle 2

02/02/2015 — 02/13/2015 = Grants and infrastructure

Work Planned

  • Grants
  • Due dates
  • Bizops
  • Infrastructure
  • Refine and document development process

Work Complete

Bizops

  • Webservice code fixed for person lookup
  • Supervisor Approver labels
  • Populated People
  • Linked reference docs, PowerPoint
  • Multiple adds to field

Grants

  • Entity details page for proposal, person, award
  • Due dates
  • IRB approvals
  • Fiscal contacts
  • Authorization system
  • Reports by PI, Researcher, Fiscal contacts
  • Report upcoming due dates, 60 day, 90 day, by person
  • Grants with no fiscal contact
  • Grants moved to production, linked from My COE > Databases

Students

  • Added PESB experience type

Recruitment

  • One off email edits – constructing a tool to allow recruiters to email different audiences in one bulk email.
  • One off email edits – Include regions based on zip codes to tool
  • One off emails – adjust tool interface is more useable (select menus)

Infrastructure

  • Patched Ghost bug
  • Built PHP 5.5 sandbox and tested, moved to development server, Drupal testing
  • Fixed HtmlToText library
  • Merged server code into version control
  • Version control documentation

Bug fixes

  • TA/RA not authorized in Help Desk ticket system
  • SWS v4 retired
  • Applicant review text encoding bugs
  • Recruitment duplicate email bug

Launched COE Institutional Research blog

  • About Agile and Epics
  • Planning dates